Parking garage for Hamburg energy networks
Parking garage for Hamburg energy networks

Parking garage for Hamburg energy networks

Services:
Construction management

GBA:
11.850 m²

Builder:
Hamburger Energienetze

Deadline:
Completion 2025

Architects:
iproplan Planungsgesellschaft mbH

Awarding procedure:
Awarding of the contract
to the general contractor

Hamburger Energienetze is planning a comprehensive reorganisation of its main site in Hamburg-Bramfeld. The approximately 100,000 m² site is to be transformed into a modern office and commercial location with an integrated training centre. Plans include optimised traffic routes and a 50 percent increase in green spaces.

The first step will be the construction of a sustainable multi-storey car park outside the company premises, which will be realised according to the design of iproplan Planungsgesellschaft mbH. For this project, bicon Generalplanung is responsible for service phases 8 and 9.

The car park will have around 530 parking spaces, at least 30 per cent of which will be equipped with e-charging stations. It is intended for DGNB certification. The building will have two upper floors, an accessible green roof and a basement. The metal slatted façade will be open on three sides; the east side facing the neighbouring residential area will remain closed and will be planted with climbing plants.

The construction project is divided into three lots:
1. road construction and civil engineering of the access road
2. building construction
3. outdoor facilities

The aim is to create a sustainable, functional and resident-friendly site.